 |
Overall information |
As has been proved, wind energy is one of the most-effective technologies in generating renewable energy and makes therefore an essential contribution for the change-over of our energy system, away from oil, coal, gas and nuclear power.
Among other things PROFES carried out the project development and the operation management for the successive listed projects: Scharndorf (12 wind turbines with a capacity of 24 megawatts), Trautmannsdorf (8 / 16 megawatts), Berg (10 / 20 megawatts), Velm-Götzendorf (10 / 12.5 megawatts), Drahany (1 / 2 megawatts), Veseli (2 / 4 megawatts), Pischelsdorf (16 / 32 megawatts) and Nikitsch (up to 16 wind turbines).
|
|
 |